Taylor Bridge maintenance scheduled for August 16th
Summer bridge maintenance on the Taylor Bridge is expected to take place starting on August 16th.

FORT ST. JOHN, B.C. — Summer bridge maintenance on the Taylor Bridge is expected to take place starting on August 16th.
DriveBC’s website states the road work is planned between the Taylor Bridge and McMahon Drive in Taylor starting at 7:00 p.m. on Friday evening and lasting until 3 a.m. Saturday morning.
Single-lane, alternating traffic will be in effect at this time. Oversized and overweight loads exceeding 3.85 metres will be required to wait until after 3:00 a.m. to cross.Â
DriveBC states to avoid lengthy delays, oversized loads should be scheduled between 7:00 p.m. and 3:00 a.m.
Check the website for further updates.
Stay connected with local news
Make us your
home page
