Highway 97 to close during avalanche control work
Highway 97, connecting Chetwynd to Prince George, will be closed for an hour between 11 a.m. to 3 p.m. on March 13th, 2026.

CHETWYND, B.C. — Highway 97 will be closed for approximately one hour today due to avalanche control work.Â
According to Drive BC, the highway connecting Chetwynd to Prince George will be closed for approximately one hour between 11 a.m. and 3 p.m., between Kloss Road and Old Hasler Road for 44.4 kilometres.
The closure is located three kilometres north of the Pine Pass summit to 17 kilometres north of McLeod Lake.Â
Local News Straight
to Your Phone
Download our app today!
Available on Android and iOS devices
Drivers should check DriveBC to get the most up-to-date information.Â
Stay connected with local news
Make us your
home page
